Skip to main content
Loading...
Loading Icon
Jaipur, India: Centre Point Tower, Ajmer Rd, Jaipur, Rajasthan Australia: Unit 1 53 Warrigal Street, The Entrance NSW 2261

Why Teams Work With BIM365

BIM That Is Simple to Buy and Safe to Build From

Outsourcing BIM only works if the model comes back the way your team would have built it. Our process is set up for that: we start from your standards, we ask questions before we guess, and every model is checked before it reaches you. Our team brings 6+ years of AEC project experience across residential, commercial, healthcare, industrial and infrastructure work.

BIM Execution Plan icon

We Start From Your BEP

Your BIM Execution Plan sets the LOD, naming, file structure and exchange rules, and we follow it. No BEP yet? We agree a short one with you before modeling starts, in line with ISO 19650.

Design query icon

We Raise Issues, Not Guesses

When a duct size is missing or a drawing disagrees with the section, we log it in a query list and send it to you. Nothing gets quietly modeled around, so design decisions stay with your engineers.

Project coordination icon

One Coordinator, Regular Updates

Each project has one coordinator who owns the schedule and talks to your team. You get progress updates against agreed milestones and review calls booked in your working hours.

Coordinated MEP services in a BIM model BIM365 team reviewing a Revit model

How a BIM365 Project Runs

The same six steps on every job, whether it is one MEP floor plate or a full multi-discipline model.

01

Review Your Drawings and BEP

We go through the drawings, specifications and BEP to check what is there, what is missing and what LOD each element needs.

02

Agree Scope, Schedule and Price

You get a written scope, a milestone schedule and a fixed price, or a monthly rate for a dedicated modeler. Revision rounds are agreed up front.

03

Model in Your Template

We build the MEP, architectural or structural model in Revit using your template, families and naming, or ours if you do not have one.

04

Coordinate and Run Clash Tests

We federate the models in Navisworks, run clash detection by discipline pair and send clear reports with viewpoints, then track each item until it is closed.

05

Check Before Delivery

A second team member checks every model against the BEP before it leaves us. The checklist we use is below.

06

Hand Over and Support

You receive the model in RVT, NWD, DWG, PDF or IFC, with clash reports and COBie data where required. Questions after handover are part of the job.

BIM Quality Control

What We Check on Every Model Before You See It

A model that opens with warnings, broken links or missing data creates work for your team. These checks happen on every delivery, not only the final one.

  • File, view and sheet names follow your BEP
  • Elements are modeled to the agreed LOD, no more and no less
  • Systems are connected, with correct system types and flow directions
  • Shared parameters are filled in for schedules, quantities and COBie
  • Open clashes are listed in the clash report with a reason and an owner
  • Unused families purged, warnings reviewed and the model audited
  • Links, coordinates and levels line up with the federated model

Frequently Asked Questions

Common questions from architects, engineers and contractors about how we work.

LOD (Level of Development) sets how much detail and reliable information each element carries. LOD 200 is approximate size and location for design development. LOD 300 has exact size, location and system data for construction documents and coordination. LOD 400 adds fabrication detail such as connections, hangers and manufacturer data for shop drawings. LOD 500 is a field-verified as-built model for handover. We model to the LOD your BEP sets for each element.

It depends on the size, the disciplines and the LOD. A single-discipline MEP model for a mid-rise building usually takes 3 to 4 weeks. A fully coordinated multi-discipline model usually takes 6 to 10 weeks. You get a milestone schedule with the quote.

Revit (RVT) is our main format. We also deliver Navisworks (NWC and NWD), DWG, PDF sheets and IFC 2x3 or IFC 4, exported with the settings your project specifies.

Yes. We work with architects, engineers and contractors in Australia, the United States, the United Kingdom, Europe and the Middle East. We work inside your Common Data Environment, such as Autodesk Construction Cloud or BIM 360, and model to the codes and standards your project names.

We sign an NDA before any files are exchanged. Where possible we work directly in your Common Data Environment, so your files stay on your platform, and only the people on your project can open them.

Want to see how this would work on your project?

Book a Free Consultation

Get in Touch

Fill out the form below and we'll get back to you as soon as possible.

Minimum 10 characters required